Please scroll down, To apply

Data Center Construction Project Manager Austin, TX

hiring now
New job

Michael Page

2024-09-20 09:49:27

Job location Austin, Texas, United States

Job type: fulltime

Job industry: Construction

Job description

  • Working for an industry leading Texas based Design Build firm that specializes in tilt wall/big box projects
  • Pipeline of Texas based light industrial projects ranging from $150-200M

Client Details

  • Texas based Design Build Firm that is rapidly growing throughout Texas
  • Strong light industrial project pipeline with a focus on production facilities, distriution centers, manufacturing facilities, and data centers
  • Received numorus construction awards for their distribution centers

Description

  • Running the scheduling from project inception to finish
  • Manage financial aspects including estimating, budgets, and cost reports
  • Conduct weekly meetings and communicate daily with the Superintendent and construction team
  • Maintain a safe work environment
  • Train and develop the project team
  • Manage subcontractor schedules and quality of work
  • Read and interpret plans, proposals and other documentation to create bids.
  • Track and analyze data to reduce gaps between estimates and actual costs.
  • Obtain and track subcontract bids and negotiate budgets.
  • Prepare and present estimate documentation, including gaps in available data.
  • Prepares estimates according to the requirements of multiple delivery systems. Reviews quotes and estimates with the project management team
  • Assists with certain post-bid buyouts.
  • Initiates and participates in meet and greet presentations with subcontractors and suppliers.
  • Comprehends contract requirements for diversity compliance.

Profile

  • 8+ years in Commercial Construction specializing in tilt wall/big box ground-up construction
  • Must have data center project experience
  • Strong oral communication and written skills
  • Ability to read and understand technical specifications, blueprints, technical manuals, product/material installation instructions and engineering/architectural drawings
  • Collaboration with other Project Managers and the Team to develop, refine, and update project schedules to ensure all milestones are identified and tracked

Job Offer

  • Competitive Base Salary
  • Bonus Structure
  • Allowances
  • Benefits
  • Insurances
  • 401K

MPI does not discriminate on the basis of race, color, religion, sex, sexual orientation, gender identity or expression, national origin, age, disability, veteran status, marital status, or based on an individual's status in any group or class protected by applicable federal, state or local law. MPI encourages applications from minorities, women, the disabled, protected veterans and all other qualified applicants.

Inform a friend!

<!– job description page –>
Top